Loaded right, documented and delivered with proof
Picked orders are packed, weighed and staged by vehicle. Each carton is scanned onto the truck, so nothing is loaded on the wrong vehicle or left behind. Documents print at the dock and the order closes when the consignee signs.
Included in every plan
9 vehicles · 3,960 cartons scanned onto the right truck
Proof of delivery
Received by S. Arora · 17:42 · Gurugram DC
Seal 004417 · reefer -18.4 °C
Recorded at departure
3,960 cartons out on 9 vehicles. Every carton scanned onto the right truck and every delivery closed with proof.
How Dock Out runs on the floor
- 01
Pack and weigh
Pack stations record box size and weight, and print shipping labels for each carton.
- 02
Stage by vehicle
Orders are staged in lanes by vehicle and route, ready before the truck arrives.
- 03
Scan onto the truck
Every carton is scanned as it is loaded. A wrong vehicle scan is stopped.
- 04
Documents at the dock
Delivery challan, invoice copy and e-way bill details print as the truck is sealed.
- 05
Proof of delivery
The driver captures signature, photo and location, and the order closes on its own.
What your team gets with Dock Out
Packing stations
Box recommendations, weight capture and carrier labels at each pack table.
Load by vehicle
Load plans by route and drop order, so the last drop goes in first.
E-way bill details
Prepare e-way bill data from the dispatch for upload, with vehicle and distance.
Seal numbers
Record seal numbers and reefer temperature at departure for cold-chain loads.
Proof of delivery
Signature, photo and GPS from the driver's phone, shared with the client portal.
Returns
Returned cartons come back through Dock In with a reason and a grade.
Specifications
The technical details supervisors and IT teams ask about first.
- Documents
- Delivery challan, packing list, invoice copy, e-way bill details
- Carriers
- Own fleet, transporters and courier aggregators
- POD capture
- Signature, photo, GPS and time
- Cold chain
- Reefer temperature and seal number at departure
The last truck is out.
Your warehouse loads next.
Put one warehouse on Gurbantu for 30 days. Scan your first inward truck, let the planner suggest slots, and close tonight with every carton accounted for.
- Load
- 500 pallet positions
- Docks
- Dock In to Dock Out
- Devices
- Any Android phone
- Seal
- No card needed
Driver copy
Cleared to load
GRB 0001 30D